SuedLink is a roughly 700 km underground direct-current line carrying wind power from northern Germany to Bavaria and Baden-Württemberg, with converter stations at Brunsbüttel, Wilster, Bergrheinfeld and Leingarten. The Elbe has been crossed by a 5.2 km tunnel, and the grid operators plan to commission the whole route at the end of 2028.
- Stage
- Under construction
- Client / owner
- TenneT and TransnetBW
- Main contractors
- Siemens Energy (converter stations Brunsbüttel and Leingarten)

