Salzgitter AG is converting its integrated steelworks to hydrogen-based direct reduction under the SALCOS programme. The first stage, costing about EUR 2.3 billion, includes a direct reduction plant, an electric arc furnace and a 100 MW electrolyser, with production expected in 2027.
- Stage
- Under construction
- Client / owner
- Salzgitter AG
- Main contractors
- Tenova (direct reduction plant); Andritz (100 MW electrolyser)

