An 18 km immersed road and rail tunnel between Rødbyhavn on Lolland and Fehmarn in Germany, built from 89 concrete elements cast at a dedicated factory in Rødbyhavn. The first element was immersed in May 2026. Femern A/S now plans to open the tunnel in two stages, and Danish media report that cars can use it from 2032 at the earliest, with trains later.
The element factory in Rødbyhavn alone employs more than 2,000 people on six production lines, and a new transformer station is being built at the tunnel portal. With work running into the 2030s, crews on Lolland need stable homes for years, not weeks.
- 18 km
- Immersed tunnel
- 89
- Tunnel elements
- 2,000+
- People at the element factory
- Stage
- Under construction
- Client / owner
- Femern A/S (Sund & Bælt)
- Main contractors
- Femern Link Contractors (VINCI-led JV incl. Per Aarsleff, Max Bögl, BAM, Wayss & Freytag, Soletanche Bachy, CFE, DEME); Elecnor (transformer station)